Campbell Residence: September 2007
|
September 14, 2007 -- The block stem walls have been covered with mortar (stucco) to cover the transition from blocks to the slab. Some of the stucco was damaged by the heavy rain (it had not set) and will be fixed. |
|
Click
Here to return to Campbell Residence: September 2007