Campbell Residence: October 2007
October 31, 2007 -- The roof is on and dried in over the master suite. The rear porch will be built next. |
Click Here to return to Campbell Residence: October 2007
October 31, 2007 -- The roof is on and dried in over the master suite. The rear porch will be built next. |