Lord Residence: September 2008
September 16, 2008 -- The interior braces have been removed in the great room. The beams are now being built between the dormer windows. |
Click Here to return to Lord Residence: September 2008
September 16, 2008 -- The interior braces have been removed in the great room. The beams are now being built between the dormer windows. |