Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: September 2007

September 17, 2007 -- Here you can see the walls. It will be filled to make it solid. The steps have to be built. The deck is filled. the outside edge (right) needs grout still.
Click Here to return to McNeil Log Cabin: September 2007