Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: September 2007

September 18, 2007 -- The steps on the east side are finished. The wall needs a few more bricks. It will then be filled and capped with stone.
Click Here to return to McNeil Log Cabin: September 2007