Residential Contractors

(843) 846 - 2500

Weiss Residence: November 2007

November 28, 2007 -- Brick has been laid around the perimeter of the porch. Now columns can be set and the front (river side) porch can be framed. The steel rods are to anchor the posts.
Click Here to return to Weiss Residence: November 2007