Gitlitz Garage: September 2007
Click on the photos to see an enlargement.
September 6, 2007 -- The garage has hurricane fabric for each window and door. The fabric will be labeled and stored in bags.
September 12, 2007 -- Interior doors have been installed and trimmed out. Baseboards and other interior trim is being done.
September 12, 2007 -- Interior painting is being completed. There is wainscot around the bottom of the room.
September 13, 2007 -- The garage downstairs has been painted. It needs trim between the simulated T-111 and sheetrock.
September 13, 2007 -- There is a nice storage area under the stairway. The box on the right is the breaker box. Right now, it is masked for painting.
September 13, 2007 -- Upstairs, the windows are painted. Chair rail is being installed between the sheet rock and wainscot. The walls have their first coat of paint.
September 14, 2007 -- Baseboards and chair rail are finished in the main room. Baseboard is needed in the bathroom. The walls have their first coat of paint.
September 19, 2007 -- The storage room (under the deck) is trimed. It has the concrete board "T-111" on the lower walls.
September 26, 2007 -- The deck is being built over the waterproof coating. It will also have railings, of course.
- Click Here to return to the Past Projects Page
- [Home]
- [News]
- [Past Projects]
- [Campbell]
- [Causey]
- [Elloree]
- [Gitlitz Cottage]
- [Gitlitz Garage]
- [Apr 07]
- [May 07]
- [Jun 07]
- [Jul 07]
- [Aug 07]
- [Sep 07]
- [Oct 07]
- [Nov 07]
- [Dec 07]
- [Griffin]
- [Groman]
- [Historic]
- [Hoats]
- [Keller]
- [Kumar]
- [Langford]
- [Lord]
- [Lowcountry Plantation]
- [McCormack]
- [McNeil]
- [Ponds]
- [Rizer]
- [Schuld]
- [Weiss]
- [Select A Builder]
- [Services]
- [FAQ]
- [Contact Us]
- [About Us]
- [Testimonials]
Copyright, 2009, Ponds & Sons Construction Company, Inc. dba Ponds & Sons