Gitlitz Cottage: July 2007
July 2, 2007 -- Gitlitz Cottage is getting a built in book case between the hallway and great room.
July 2, 2007 -- Interior painting has begun. The two bedrooms are now primed.
July 3, 2007 -- The built in book case now has trim along the floor. It will have adjustable shelves very soon.
July 3, 2007 -- Trim is installed around the top of the utility closet that divides the kitchen from the hallway.
July 3, 2007 -- The disappearing stairway has been installed for access to a storage area over the guest bathroom.
July 6, 2007 -- The cabinets are installed in the Gitlitz Cottage. The right cabinet will hold a stove top. The right opening is for a dishwasher. The openings on the left and on the left wall are for under counter refrigerators.
July 11, 2007 -- Final painting is starting. If you look closely, you can see the color over the kitchen cabinets.
July 12, 2007 -- The cottage has its first coat of interior paint (after the primer). The interior trim is also painted.
July 12, 2007 -- The master bath is painted. The window casing is also painted.
July 16, 2007 -- The ceiling is having beams installed today. Here is how it looks without beams.
July 18, 2007 -- The ridge beam has wood trim now. The dormer beams are also in place. Soon, more beams will be added.
July 19, 2007 -- The ceiling has more beams added. Notice the beams between the lights and the chimney.
July 19, 2007 -- Each set of beams on the roof gets a cross beam like this one. It will also have a beam from the ridge beam to the center of the cross beam.
July 20, 2007 -- The ceiling beams are finished. There are four of them in the great room. The center two beams get track lighting.
July 20, 2007 -- The center two beams are next to the dormers. These two beams have track lighting.
July 21, 2007 -- More woodwork trim is being done at the cottage. Sheet rock has been cut back exposing the beam along the front.
July 21, 2007 -- The final bronze screen wire finally arrived. It was on back order for several weeks. The back porch screening is complete.
July 23, 2007 -- The ceiling of the guest bedroom is pickled. A pickled finish is one that is a thin paint so the grain is visible.
July 24, 2007 -- The ceiling was painted today. It is a shiny white.
July 24, 2007 -- The built in has also been painted in the gloss white paint.
July 24, 2007 -- This is a shot over the utility closet showing some of the beam work. The doors have not been installed yet.
July 24, 2007 -- This is yet another view of the painted woodwork. The light near the center is from the gable window. A scaffold is on the right edge of the photo.
July 26, 2007 -- The front door has interior casing installed. It will be painted to match the other trim.
- Click Here to return to the Past Projects Page
- [Home]
- [News]
- [Past Projects]
- [Campbell]
- [Causey]
- [Elloree]
- [Gitlitz Cottage]
- [Oct 06]
- [Nov 06]
- [Dec 06]
- [Jan 07]
- [Feb 07]
- [Mar 07]
- [Apr 07]
- [May 07]
- [Jun 07]
- [Jul 07]
- [Aug 07]
- [Sep 07]
- [Oct 07]
- [Nov 07]
- [Gitlitz Garage]
- [Griffin]
- [Groman]
- [Historic]
- [Hoats]
- [Keller]
- [Kumar]
- [Langford]
- [Lord]
- [Lowcountry Plantation]
- [McCormack]
- [McNeil]
- [Ponds]
- [Rizer]
- [Schuld]
- [Weiss]
- [Select A Builder]
- [Services]
- [FAQ]
- [Contact Us]
- [About Us]
- [Testimonials]
Copyright, 2009, Ponds & Sons Construction Company, Inc. dba Ponds & Sons