Groman Residence: September 2008
September 18, 2008 -- The public bath is being framed. The black pipes are for the hydrostatic heating. Temporary bracing is still in place. |
Click Here to return to Groman Residence: September 2008
September 18, 2008 -- The public bath is being framed. The black pipes are for the hydrostatic heating. Temporary bracing is still in place. |