Residential Contractors

(843) 846 - 2500

Groman Residence: September 2008

September 19, 2008 -- No framing has been done on the garage walls yet. The door to the garage is over the middle of the slab. The wood on the block wall is temporary and marks the hydrostatic heating circuits.
Click Here to return to Groman Residence: September 2008