Residential Contractors

(843) 846 - 2500

Groman Residence: September 2008

September 24, 2008 -- The main ridge beam is in place. It is over 21 feet above the floor. Cross ridge beams will be installed, probably this afternoon.
Click Here to return to Groman Residence: September 2008