Groman Residence: September 2008
|
September 29, 2008 -- This is the entry porch. The master bedroom gable wall on the left will be built soon. The high gable wall over the entrance is the only high gable not complete. It will be finished this afternoon. |
|
Click
Here to return to Groman Residence: September 2008