Residential Contractors

(843) 846 - 2500

Groman Residence: September 2008

September 29, 2008 -- This is the entry porch. The master bedroom gable wall on the left will be built soon. The high gable wall over the entrance is the only high gable not complete. It will be finished this afternoon.
Click Here to return to Groman Residence: September 2008