Groman Residence: December 2008
December 10, 2008 -- The windows are being covered in preparation for priming the walls and painting the ceiling. |
Click Here to return to Groman Residence: December 2008
December 10, 2008 -- The windows are being covered in preparation for priming the walls and painting the ceiling. |