Groman Residence: December 2008
|
December 11, 2008 -- Heavy casing for the garage doors was installed today. Baseboard was also installed inthe garage. The large box on the wall is the electrical box. It was covered with plastic to protect it when the walls were primed. |
|
Click
Here to return to Groman Residence: December 2008