Residential Contractors

(843) 846 - 2500

Groman Residence: December 2008

December 23, 2008 -- The dog yard slab is poured. The far wall will be wooden fence (between the two wooden posts). A chain link will be built on the other two sides. Notice the white holes in the concrete for the posts. A gray conduit is coming up near the garage to carry a wire to the well pump.
Click Here to return to Groman Residence: December 2008