Residential Contractors

(843) 846 - 2500

Groman Residence: December 2008

December 31, 2008 -- The master shower is tiled on all walls, the floor and the ceiling. Brushed nickle controls will be installed on the valve on the left. A frameless shower door has been ordered and will be installed in the next few days.
Click Here to return to Groman Residence: December 2008