Lord Residence: October 2008
October 20, 2008 -- The front gable of the garage was finished today. The band along the bottom was also installed. |
Click Here to return to Lord Residence: October 2008
October 20, 2008 -- The front gable of the garage was finished today. The band along the bottom was also installed. |