McNeil Log Cabin: September 2007
|
September 4, 2007 -- Block work is done for the front patio. Each side will have steps where you can see the foundation. The blocks will be filled with packed dirt. A concrete slab will be poured on top. Then bricks will cover the top of the patio and steps. |
|
Click
Here to return to McNeil Log Cabin: September 2007