McNeil Log Cabin: September 2007

September 4, 2007 -- Block work is done for the front patio. Each side will have steps where you can see the foundation. The blocks will be filled with packed dirt. A concrete slab will be poured on top. Then bricks will cover the top of the patio and steps.