Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: September 2007

September 7, 2007 -- Yesterday, the slab was poured. Brick laying began on the patio near the house and the outside wall.
Click Here to return to McNeil Log Cabin: September 2007