Residential Contractors

(843) 846 - 2500

Weiss Residence: September 2007

September 17, 2007 -- This area is where the rear porch will be built. Notice the change in height of the block wall. The far end is where the lot is highest. The sideways blocks are for ventilation.
Click Here to return to Weiss Residence: September 2007