Residential Contractors

(843) 846 - 2500

Weiss Residence: September 2007

September 26, 2007 -- The block walls are up for the garage floor. Dirt will be added and compacted inside the blocks and the slab will be poured.
Click Here to return to Weiss Residence: September 2007